Sunday, January 9, 2011

Florida Gas Transmission Company | The 36 Inch Pipeline | Thirteen Year-Old Investigates

Florida Gas Transmission Company and The 36 Inch Pipeline Application Documents  | Thirteen Year-Old Investigates

The staff of the Federal Energy Regulatory Commission (FERC or Commission) has prepared this Environmental Impact Statement (EIS) to assess the environmental impacts associated with the construction of facilities proposed by Florida Gas Transmission Company, LLC (FGT) in accordance with the requirements of the National Environmental Policy Act of 1969. Complete Documents for the permit that was granted can be found here: http://elibrary.ferc.gov/ Search for Docket Number CP09-17-

Take a look at what a 13 year-old boy found and documented during a recent walk through a now nearly-dry wetland near Hillsborough County's Flatwoods Park, the source of Tampa Bay's drinking water.

Wetland Video



Aerial Photo of the Scene:


Aerial Photo of Path Near Flatwoods Preserve:




Gasland Trailer: This Film Did Not Involve The Florida Pipeline

No comments:

Post a Comment